1. Sheet1

 ABCDE
1 Jackson High School Inside Corridor Measurements 
2 (See attached Map) 
3     
4 Upper Floor Starting Point= 1510 Feet 
5 A South Entry Stairs to West Corner 1579.4 69.4 
6 B West Corner to Stairs by Boys' Bathroom 1672.3 92.9 
7 C Boys' Bathroom Stairs to East End of Hallway 1884.1 211.8 
8 D East End of Hallway to Stairs by Girls' Bathroom 1970.0 85.9 
9 E Stairs by Girls' Bathroom to South Entry Stairs 2110.4 140.4 
10  Upper Loop C-Wing  600.4 
11 F Stairs by Boys' Bathroom to D-Wing Stairs 2322.5 212.1 
12 G West End of Hallway to Top Main Office Stairs 2497.0 174.5 
13  Lower Floor   
14 H South Entry Stairs to Stairs by Girls' Bathroom 2855.7 166.0 
15 I Girls' Bathroom Stairs to East End of Hallway 3069.4 213.7 
16 J East End of Hallway to Boys' Bathroom Stairs 3148.8 79.4 
17 K Boys' Bathroom Stairs to South Entry Stairs 3307.3 158.5 
18  Lower Loop C-Wing  617.6 
19 L Stairs by Girls' Bathroom to D-Wing Stairs 3501.7 194.4 
20 M East End of Hallway to Bottom Main Office Stairs 3644.8 143.1 
21 N Bottom Main Office Stairs to Bottom Gym Stairs 3838.1 193.3 
22 O Top Main Office Stairs to Top Gym Stairs 2689.7 192.7 
23 P Bottom Gym Stairs to Far Northeast End Gym Stairs 4058.3 220.2 
24     
25  Stairs by Main Office + Landing  29.3 264
26  Stairs by C-205 (Southeast End) + Landing  34.0 264
27  Stairs by C-243 (Northwest End) + Landing  32.8 276
28  Stairs by C-220 (Middle Back) + Landing  33.7 270
29  Stairs - D-wing (West End) + Landing  38.5 288
30  Stairs by Gym (South Side) + Landing  37.7 281
31  Stairs by back of Gym (Far North) + Landing  38.3 287.5
32     
33  Loops Feet  
34     
35  1/4 Mile 1320.0  
36     
37  1/3 Mile 1758.2  
38     
39  1/2 Mile 2640.0  
40     
41  2/3 Mile 3516.5  
42     
43  3/4 Mile 3960.0  
44     
45  1 Mile 5280.0  

Back to top