1. 5:35 Program Certification status (Mike Plumb)
  2. 6:00 Does Everett Public Schools’ Auto program standards align with industry needs? If so, how? If not, what are current and future industry needs?
  3. 6:30 What should the automotive program look like in one year? Two years? 
  4. How can Everett Public Schools offer an introductory program at each high school? What would a typical classroom look like? How can this help Everett Public Schools address the growth in manufacturing in the county?



Automotive Advisory Committee

Cascade High School, Automotive Laboratory

May 23, 2007 - 5:30 - 7 p.m.

 


 

5:30  Welcome – Introductions

 

 
5:35 Program Certification status (Mike Plumb)
 
 

Back to top




6:00  Does Everett Public Schools’ Auto program standards align with industry needs? If so, how? If not, what are current and future industry needs?

 

 

Back to top




6:30  What should the automotive program look like in one year? Two years?  

Back to top




How can Everett Public Schools offer an introductory program at each high school? What would a typical classroom look like? How can this help Everett Public Schools address the growth in manufacturing in the county?

 

  How should our program connect with the offerings at Sno-Isle Tech?

 
 


6:55  Schedule next meeting

(Need to make up for the February meeting that was cancelled.)

 

 
7:00 Adjourn
 
 

Back to top