1. (GF) Selective Stair Treads and Flooring Projects
    2. (GF) Selective Painting Projects
    3. (P132) New Elementary School #18
    4. (P198) Purchase 14 Portables for High Schools
    5. (P198) Purchase 10 Portables for Elementary and Middle Schools
    6. (P260) Synthetic Turf Fields at JHS and CHS
    7. (P261) Synthetic Turf Replacement at Everett HS Lincoln Field
    8. (P282) Playground Equipment
    9. (P282) Stadium Reader Board and CRC Exterior Signage
    10. (P283) Longfellow Site Redevelopment
    11. (P319) North MS Modernization and Partial Replacement
    12. (P320) Woodside ES Modernization and Partial Replacement
    13. (P340) Safety and Security Upgrades
    14. (P382) Healthy Kids, Healthy Schools Grant
    15. (P382) Portable Ramp Replacement
    16. (P420) Preserve and Restore Exterior Finish at Everett HS Main Building
    17. (P430) Painting Projects at 7 sites
    18. (P483) Flooring Replacements at 6 Sites
    19. (P554) Gateway MS Roof Replacement
    20. (P582) Athletics Roof & Gutter Replacement (plus South Ticket Booth/Football Press Box)
    21. (P582) Re-roof 4 Portables
    22. (P583) Roofing Replacement at 6 Sites
    23. (P685) HVAC Upgrades at 8 Sites
    24. (P775) Technology Infrastructures
    25. (P822) Fire Alarm System Upgrades at 7 Sites
    26. (P960) Support Services Master Plan
    27. (P994) 174th Street SE Site Purchase
    28. (P995) Purchase Future ES Property

    Capital Project Status Report

     




    (GF) Selective Stair Treads and Flooring Projects

     

    Location Jackson HS 1508 136th Street SE, Mill Creek WA 98012
           
    Sequoia HS 3516 Rucker Avenue, Everett WA 98201
    Architect TBD  
    Contractor TBD
    Estimated project cost $150,000  
    Estimated completion date August 2017
    Funding source General fund (transfer from capital levy)      
     
    Description: This project includes replacement of stair treads at Jackson HS, Sequoia HS, and at other selected locations.
     
    Project update as of December 7, 2016: Design work will begin in January.
                  
    (TBD = to be determined)
    _______________________________________________________________________________________
     
    Additional Project Information
     
    Estimated construction cost
     
    $105,000
    Construction contract
       
    TBD
    Change orders during construction  TBD    
    Final construction cost
     
    TBD  
    Final project cost
       
    TBD    
    Actual completion date
     
    TBD  
                
    Completion schedule:
    Architect selection TBD
    Design phase TBD
    Out to bid Spring 2017
    Bid award May 2017
    Construction start June 2017  
    Construction Final August 2017
     
     



    (GF) Selective Painting Projects

    Location 2222 Everett Avenue, Everett WA 98201
           
    1419 Trillium Blvd., S.E., Mill Creek, WA 98012
    Architect TBD  
    Contractor TBD
    Estimated project cost $100,000  
    Estimated completion date August 2017
    Funding source General fund (transfer from capital levy)      
     
    Description: This project includes re-sealing the exterior of the Maintenance & Operations building and vehicle maintenance building, as well as painting of selected interior areas at Heatherwood MS.
     
    Project update as of December 7, 2016: The work to develop the contract documents for this project will begin in January.
                  
    (TBD = to be determined)
    ______________________________________________________________________________________
     
    Additional Project Information
     
    Estimated construction cost
     
    $70,000
    Construction contract
       
    TBD
    Change orders during construction  TBD    
    Final construction cost
     
    TBD  
    Final project cost
       
    TBD    
    Actual completion date
     
    TBD  
     
    Completion schedule:
    Architect selection TBD
    Design phase March 2017
    Drawings and specifications
    April 2017
    Out to bid May 2017
    Bid award May 2017
    Construction start June 2017
    Construction Complete August 2017
     
     



    (P132) New Elementary School #18

     

    Location 180th St SE & 46th Ave SE, Bothell, WA 98012
    Architect Dykeman  
    Contractor TBD
    Estimated project cost $43,900,000  
    Estimated completion date August, 2019  
    Funding source 2016 Capital bond      
     
    Description: This project will include a new 73,000 square foot, 2-story elementary school with 28 general education classrooms on district-owned property at 180th St SE & 46th Ave SE, Bothell, WA. Off-site work is anticipated to include street improvements and signalization, plus development of a vehicular/pedestrian access from the north side of the site to 174th Street SE. This site is also the anticipated future location of a new full size comprehensive high school.
     
    Project update as of December 06, 2016: The architect and design team have been selected. They have begun evaluating the site and developing schematic designs. The wetlands survey and geo-technical survey are complete. The district has engaged a land use planner to support the district in securing approval of a Conditional Use Permit (CUP) from Snohomish County for the permitting of a new elementary school. The Educational Specifications committee meetings have concluded and the architect is drafting the report. The first draft for review is expected by mid-January.
     
    At the November 22, 2016 board meeting, the board approved resolution #1140 approving the purchase of property adjacent to the 180th St. SE site (4328 & 4400 174th St. SE, Bothell, WA). This is to accommodate a roadway to the north with access to 174th St SE.
     
    (TBD = to be determined)
    ______________________________________________________________________________________
     
    Additional Project Information
     
    Estimated construction cost
     
    $29,822,100
    Construction contract
       
    TBD  
    Change orders during construction  TBD      
    Final construction cost
     
    TBD    
    Final project cost
       
    TBD      
    Actual completion date
     
    TBD    
                
    Completion schedule:
    Architect selection August 2016
    Educational specifications January 2017
    Design phase May 2017
    Drawings and specifications
    September 2017
    Permit applications March 2017 through April 2018
    Out to bid March 2018
    Bid award April 2018
    Construction start May 2018  
    Occupancy/move in August 2019
     
     



    (P198) Purchase 14 Portables for High Schools

     

    Location Varies
    Architect TBD  
    Contractor TBD
    Estimated project cost $2,800,000  
    Estimated completion date Fall 2020
    Funding source 2016 Capital bond    
     
    Description: This project includes purchase and installation of 14 portables, to accommodate high school student enrollment increases, including furniture and equipment, classroom technology, security systems, ramps, stairs, raised walkways, and utility connections.
     
    Project update as of December 7, 2016: It is anticipated that the 14 portables in the capital bond will be purchased and placed starting in 2019 due to anticipated high school enrollment growth.
     
    (TBD = to be determined)
    _____________________________________________________________________________________
     
    Additional Project Information
     
    Estimated construction cost
     
    $1,741,000
    Construction contract
       
    TBD
    Change orders during construction  TBD    
    Final construction cost
     
    TBD  
    Final project cost
       
    TBD    
    Actual completion date
     
    TBD  
     
    Completion schedule:
    Architect selection TBD
    Educational specifications
    Design phase TBD
    Drawings and specifications
    TBD
    Permit applications TBD
    Out to bid TBD
    Bid award TBD
    Construction start TBD
    Occupancy/move in TBD
     



    (P198) Purchase 10 Portables for Elementary and Middle Schools

     

    Location Varies
    Architect TBD  
    Contractor TBD
    Estimated project cost $2,011,000  
    Estimated completion date Fall 2018
    Funding source 2016 Capital levy    
     
    Description: This project includes purchase and installation of 10 portables, to accommodate elementary and middle school student enrollment increases, including furniture and equipment, classroom technology, security systems, ramps, stairs, raised walkways, and utility connections.
     
    Project update as of December 7, 2016: District staff has completed the second of three meetings to determine the number and location of portables needed, based on updated enrollment and capacity projections as well as program needs. Principals have also submitted their requests for portables.
     
    (TBD = to be determined)
    ______________________________________________________________________________________
     
    Additional Project Information
     
    Estimated construction cost
     
    $1,112,800
    Construction contract
       
    TBD
    Change orders during construction  TBD    
    Final construction cost
     
    TBD  
    Final project cost
       
    TBD    
    Actual completion date
     
    TBD  
     
    Completion schedule:
    Architect selection December 2016
    Educational specifications N/A
    Design phase January 2017
    Drawings and specifications
    February 2017
    Permit applications March 2017
    Out to bid April 2017
    Bid award April 2017
    Construction start April 2017
    Occupancy/move in July 30, 2017
     



    (P260) Synthetic Turf Fields at JHS and CHS

     

    Location HM Jackson HS – 1508 136th Street SE, Mill Creek, WA 98012
    Cascade HS – 801 E. Casino Road, Everett, WA 98203
    Architect D.A. Hogan & Associates  
    Contractor TBD
    Estimated project cost $4,250,000  
    Estimated completion date September 2017
    Funding source Varies      
     
    Description: This project includes installation of new synthetic turf at the existing football fields at Cascade HS and Jackson HS, including new drainage and irrigation/wash-down systems.
     
    Project update as of December 7, 2016: D.A. Hogan is proceeding with design work on both sites. Contracts have been sent to D.A. Hogan.
                
    (TBD = to be determined)
    _______________________________________________________________________________________
     
    Additional Project Information
    HM Jackson HS Cascade HS
    Estimated construction cost $1,550,000$1,550,000
    Construction contract TBDTBD
    Change orders during construction TBD  TBD
    Final construction cost TBDTBD
    Final project cost TBDTBD
    Actual completion date TBDTBD
     
    Completion schedule:
    Architect selection September 2016September 2016
    Educational specifications N/AN/A
    Design phase TBDTBD
    Drawings and specifications TBDTBD
    Permit applications TBDTBD
    Out to bid TBDTBD
    Bid award TBDTBD
    Construction start May 2016May 2016
    Occupancy/move in September 2017September 2017
     



    (P261) Synthetic Turf Replacement at Everett HS Lincoln Field

     

    Location 1898 25th St, Everett, WA 98201
    Architect TBD  
    Contractor TBD
    Estimated project cost $1,500,000  
    Estimated completion date Fall 2018
    Funding source 2016 Capital bond    
     
    Description: This project includes replacement of the existing synthetic turf surface with new synthetic turf surface. The old surface is worn out due to wear and deterioration, and is in need of replacement. The original field was installed in 2004.
     
    Project update as of December 7, 2016: Design of this project is scheduled to begin fall, 2017.
                  
    (TBD = to be determined)
    _______________________________________________________________________________________
     
    Additional Project Information
     
    Estimated construction cost
     
    $1,036,200
    Construction contract
       
    TBD
    Change orders during construction  TBD    
    Final construction cost
     
    TBD  
    Final project cost
       
    TBD    
    Actual completion date
     
    TBD  
                
    Completion schedule:
    Architect selection Summer 2017
    Educational specifications N/A
    Design phase Winter 2018
    Drawings and specifications
    Winter 2018
    Permit applications Winter 2018
    Out to bid Spring 2018
    Bid award Spring 2018
    Construction start Summer 2018  
    Occupancy/move in Fall 2018
     



    (P282) Playground Equipment

     

    Location Hawthorne ES 1110 Poplar Street, Everett WA
           
    Lowell ES 5010 View Drive, Everett WA
           
    Cedar Wood ES 3414 168th Street S.E., Bothell WA
    Architect N/A
    Contractor Buell Recreations (Lowell ES & Hawthorne ES)
    Play Creations/KCDA (Cedar Wood ES)
    Estimated project cost $220,000  
    Estimated completion date December 2016
    Funding source Varies
        
    Description: Purchase and installation of playground equipment at three schools with funding from a Snohomish County grant as well as funding from a variety of other agencies and individuals. This project includes removal and replacement of all playground equipment at Hawthorne ES, some of the playground equipment at Lowell ES, and the addition of some new play equipment at Cedar Wood ES; all to be completed by December 31, 2016.
     
    Project update as of December 8, 2016: The playground equipment installation at Hawthorne is substantially complete. Site restoration work will continue at Hawthorne when the weather permits. The playground installation at Lowell is complete. Cedar Wood is having their playground equipment installed today. A ribbon cutting ceremony has been planned by the PTA and will be held on December 10, 2016.
                      
    (TBD = to be determined)
    _______________________________________________________________________________________
     
    Additional Project Information
     
    Estimated construction cost
     
    $176,000
    Construction contract
       
    $219,348
    Change orders during construction  pending
    Final construction cost
     
    TBD
    Final project cost
       
    TBD  
    Actual completion date
     
    December 2016
                
    Completion schedule:
    Architect selection N/A
    Educational specifications N/A
    Design phase September 2016
    Drawings and specifications
    September 2016
    Permit applications N/A
    Out to Bid N/A
    Bid award N/A
    Construction start October 2016  
    Occupancy/move in December 2016
     



    (P282) Stadium Reader Board and CRC Exterior Signage

     

    Location 3830 & 3900 Broadway Ave, Everett, WA 98201
    Architect Dykeman
    Contractor Stadium reader board - Daktronics
    CRC building signs-TBD
    Estimated project cost $250,000  
    Estimated completion date Summer 2017
    Funding source
       
    Rent, miscellaneous
     
     
    Description: Installation of a new reader board at Everett memorial stadium to replace the outdated reader board in front of the stadium at 3830 Broadway Ave, Everett, WA, which is deteriorated and non-functional. Also included are two new exterior illuminated building signs at the district’s Community Resource Center, 2900 Broadway Ave, Everett WA.
     
    Project update as of December 8, 2016: A concept for the reader board and building signs has been developed. A consultant has been hired to begin permitting the signs. Staff is reviewing sign products from various manufacturers.
     
            
    (TBD = to be determined)
    _______________________________________________________________________________________
     
    Additional Project Information
     
    Estimated construction cost
     
    $150,000
    Construction contract
       
    TBD
    Change orders during construction  TBD    
    Final construction cost
     
    TBD  
    Final project cost
       
    TBD    
    Actual completion date
     
    TBD
                
    Completion schedule:
    Architect selection August 2016
    Educational specifications N/A
    Design phase October 2016
    Drawings and specifications
    TBD
    Permit applications TBD
    Out to bid TBD
    Bid award TBD
    Construction start March 2017
    Occupancy/move in
       
    N/A



    (P283) Longfellow Site Redevelopment

     

    Location 3715 Oakes Ave, Everett, WA 98201
    Architect Botesch, Nash and Hall Architects  
    Contractor TBD
    Estimated project cost $750,000  
    Estimated completion date Summer 2017
    Funding source Rent, miscellaneous      
     
    Description: This project includes demolition of the Longfellow and Annex buildings located at the north end of Everett Memorial Stadium, and redevelopment of the site into new parking areas for school and community use. The Longfellow building was built in 1911 and the annex was constructed in 1956, and expert analysis has shown they would be too expensive to upgrade and maintain in the long term. Leading up to this point, the district has already completed an extensive real estate marketing effort in an unsuccessful attempt to locate a prospective purchaser of these buildings with the financial backing to complete a purchase and sale, or lease, of the property. Before proceeding with demolition, the district is required to perform an environmental review and to document the historical character of these buildings.
     
    Project update as of December 7, 2016: The design team and land use consultant will submit for SEPA subsequent to the January 10 board meeting. The hazardous materials survey determined that the paint that is peeling off the interior walls contains lead. A contractor will perform the lead abatement work on December 8 and 9th. King 5 is tentatively scheduled to bring a camera crew into the building on December 12.
     
    (TBD = to be determined)
    _______________________________________________________________________________________
     
    Additional Project Information
     
    Estimated construction cost
     
    $470,000
    Construction contract
       
    TBD
    Change orders during construction  TBD  
    Final construction cost
     
    TBD  
    Final project cost
       
    TBD    
    Actual completion date
     
    TBD  
                
    Completion schedule:
    Architect selection June 2016
    Educational specifications N/A
    Design phase January 2017
    Drawings and specifications
    January 2017
    Permit applications January 2017
    Out to bid March 2017
    Bid award April 2017
    Construction start April 2017
    Occupancy/move in August 2017
     



    (P319) North MS Modernization and Partial Replacement

     

     
    Location 2514 Rainier Avenue, Everett, WA 98201
    Architect NAC Architects  
    Contractor TBD
    Estimated project cost $50,100,000  
    Estimated completion date August, 2019
    Funding source
       
    2016 Capital bond
     
    Description: This project includes modernization of the main gymnasium areas, a new 2-story classroom building to accommodate 30 general education classrooms, and a new 1-story administration building, while retaining the recently constructed auxiliary gymnasium. Site work is expected to include new perimeter fencing and upgrades to the track and field.
     
    Project update as of December 8, 2016: The architect and design team have been selected, and have begun evaluating the existing site and building conditions. The Educational Specifications process began in September and is nearing completion. A draft of the educational specification report is due in early January. The design team is in the process of a design charrette.
              
    (TBD = to be determined)
    _______________________________________________________________________________________
     
    Additional Project Information
     
    Estimated construction cost
     
    $32,369,000
    Construction contract
       
    TBD
    Change orders during construction  TBD    
    Final construction cost
     
    TBD
    Final project cost
       
    TBD  
    Actual completion date
     
    TBD
                
    Completion schedule:
    Architect selection August 2016
    Educational specifications January 2017
    Design phase May 2017
    Drawings and specifications
    January 2018
    Permit applications July 2017
    Out to bid February 2018  
    Bid award March 2018
    Construction start April 2018
    Occupancy/move in
       
    June 2019
     



    (P320) Woodside ES Modernization and Partial Replacement

     
    Location 17000 23rd Ave SE, Bothell, WA 98012
    Architect Studio Meng Strazzara Architects    
    Contractor TBD
    Estimated project cost $27,800,000  
    Estimated completion date Fall, 2020
    Funding source
       
    2016 Capital bond  
     
    Description: This project includes a complete modernization of the gymnasium/cafeteria building and three classroom buildings; demolition of administration/library building and construction of new administration/library building in a new location at the front of the school. Site work is expected to include fencing between buildings to improve security.
     
    Project update as of December 7, 2016: The architect has been selected for this project, and design work is scheduled to begin in Spring 2018. This project will be constructed during the 2019-20 school year, after the completion of new Elementary School No. 18. A geotechnical engineering firm hired by the district completed soil bearing testing at the site.
     
                    
    (TBD = to be determined)
    _______________________________________________________________________________________
     
    Additional Project Information
     
    Estimated construction cost
     
    $20,805,080
    Construction contract
       
    TBD
    Change orders during construction  TBD  
    Final construction cost
     
    TBD
    Final project cost
       
    TBD    
    Actual completion date
     
    TBD  
                
    Completion schedule:
    Architect selection August 2016
    Educational specifications Spring 2018
    Design phase Fall 2018
    Drawings and specifications
    Spring 2019
    Permit applications Spring 2019
    Out to bid Spring 2019
    Bid award Spring 2019
    Construction start Summer 2019  
    Occupancy/move in
       
    Fall, 2020
     
     
     
     
     
     
     



    (P340) Safety and Security Upgrades

     

    Location Varies (see below)
    Architect Botesch, Nash and Hall Architects  
    Contractor TBD
    Estimated project cost $8,569,000  
    Estimated completion date Summer 2019
    Funding source 2016 Capital levy
      
     
    Description: This project includes the provision of safety and security upgrades at eighteen (18) schools in the district. Due to the capital levy funding collection timeline, which spans six years, this project will be completed in multiple phases over several years. The first phase of this work is anticipated to occur during summer 2017, with phases two and three anticipated to occur during summer 2018 and 2019, respectively.
     
    While the selections and design of projects in each of these phases have not yet been finalized, the first phase will likely consist of the following nine schools: Cedar Wood, Mill Creek, Silver Firs, Penny Creek, Emerson, Garfield, Hawthorne, Jefferson and Whittier elementary schools. The first four of these schools in phase one (Cedar Wood, Mill Creek, Silver Firs and Penny Creek elementary schools) are slated to receive, at a minimum, new door hardware on the library doors, thereby allowing the libraries to be secured from entries off of the main vestibules to the office areas.
     
    The remaining five schools in the first phase (Emerson, Garfield, Hawthorne, Jefferson and Whittier elementary schools) are scheduled to receive upgrades of their existing vestibules to be more secure, by constructing walls with new doors and hardware at strategic locations in the corridors, thereby closing off the existing lobbies to the rest of the school.
    The work on the remaining nine schools in phases two and three (Lowell, Madison, Silver Lake, and Jackson elementary schools; Eisenhower, Evergreen, Heatherwood, and Gateway middle schools; and Jackson High School) are expected to be more complex, and will likely include significant remodeling and/or relocations of reception areas, administrative offices, and entry vestibules, as well as new exterior security fencing on some of the sites.
    It is important to note that the scope of the work described herein is conceptual in nature, and the final scope of work at each school will be determined during the design process with input from police, school staff, and other appropriate stakeholders.
    Project update as of December 06, 2016: An ad-hoc committee was created to develop safety & security guidelines for the architect to follow providing consistency across the district. With the guidelines in hand, the architect met with nine school principals regarding their site. The architect is engaging their sub-consultants to start design, cost estimates and detailed schedules.
     
    (TBD = to be determined)
    _______________________________________________________________________________________
     
    Additional Project Information
     
    Estimated construction cost
     
    $5,320,000
    Construction contract
       
    TBD  
    Change orders during construction  TBD    
    Final construction cost
     
    TBD  
    Final project cost
       
    TBD    
    Actual completion date
     
    TBD  
                
    Completion schedule:
    Architect selection August 2016
    Educational specifications Fall 2016
    Design phase Fall 2016
    Drawings and specifications
    Winter 2017
    Permit applications Winter 2017
    Out to bid March 2017
    Bid award April 2017
    Construction start June 2017  
    Occupancy/move in
       
    August 2017



    (P382) Healthy Kids, Healthy Schools Grant

     

    Location Sequoia HS 3516 Rucker Ave. Everett WA
    Jackson HS 1508 136th Street S.E. Mill Creek WA
     
    Architect JLR Design Group- Sequoia  
     
    Contractor Bargreen Ellison for Dish Washing Station-Sequoia
    Holmberg- Water Bottle Filling Stations  
    Estimated project cost $115,000  
    Estimated completion date
    Funding source Rent, miscellaneous    
     
    Description: This project includes the purchase and installation of a dishwashing station at Sequoia HS and a water bottle filling station at each of the four district high schools, funded in large part through a state OSPI grant of $98,284.
     
    Project update as of December 8, 2016: The work associated with the dishwashing station at Sequoia HS is complete. Water bottle filling stations have been installed at four high schools.
    (TBD = to be determined)
    _______________________________________________________________________________________
     
    Additional Project Information
     
    Estimated construction cost
     
    $103,475
    Construction contract $66,681 for Sequoia HS dishwasher
    $36,794 for 4 water bottle filling stations
    Change orders during construction      
    Final construction cost
       
    Final project cost
           
    Actual completion date
       
                
    Completion schedule:
    Architect selection
    Educational specifications December 2015
    Design phase March 2015
    Drawings and specifications
    March 2015
    Permit applications June 2016 and November 2016 for Water Bottle Filling Stations
    Out to bid September 2016 Water Bottle Filling Stations
    Bid award October 5, 2016 Water Bottle Filling Stations
    Construction start November 2016  
    Occupancy/move in
       
    December 2016



    (P382) Portable Ramp Replacement

     

    Location Varies
    Architect TBD  
    Contractor TBD
    Estimated project cost $382,000  
    Estimated completion date Fall 2022
    Funding source 2016 Capital levy    
     
    Description: Includes removal and disposal of existing portable ramps and replacement with new pre-manufactured metal ramp systems District-wide.
      
    Project update as of December 7, 2016: This project is scheduled to be completed during summer 2022
                  
    (TBD = to be determined)
    _______________________________________________________________________________________
     
    Additional Project Information
     
    Estimated construction cost
     
    $253,680
    Construction contract
       
    TBD
    Change orders during construction  TBD  
    Final construction cost
     
    TBD  
    Final project cost
       
    TBD    
    Actual completion date
     
    TBD  
                
    Completion schedule:
    Architect selection Fall 2021
    Educational specifications N/A
    Design phase Fall 2021
    Drawings and specifications
    Winter 2022
    Permit applications Winter 2022
    Out to bid Spring 2022
    Bid award Spring 2022
    Construction start Summer 2022  
    Occupancy/move in Fall 2022
     



    (P420) Preserve and Restore Exterior Finish at Everett HS Main Building

     

    Location 2416 Colby Ave, Everett, WA 98201
    Architect TBD  
    Contractor TBD
    Estimated project cost $900,000  
    Estimated completion date Fall 2019
    Funding source 2016 Capital bond    
     
    Description: This project will include cleaning, sealing, caulking, and repointing of the existing exterior masonry and terra cotta, in order to preserve and enhance the historical façade of the building.
     
    Project update as of December 7, 2016: Design of this project is scheduled to begin fall, 2018.
     
    (TBD = to be determined)
    _______________________________________________________________________________________
     
    Additional Project Information
     
    Estimated construction cost
     
    $611,600
    Construction contract
       
    TBD
    Change orders during construction  TBD  
    Final construction cost
     
    TBD  
    Final project cost
       
    TBD    
    Actual completion date
     
    TBD  
                
    Completion schedule:
    Architect selection Summer 2018
    Educational specifications N/A
    Design phase Fall 2018
    Drawings and specifications
    Winter 2019
    Permit applications Spring 2019
    Out to bid Spring 2019
    Bid award Spring 2019
    Construction start Summer 2019  
    Occupancy/move in Fall 2019
     



    (P430) Painting Projects at 7 sites

     

    Location Varies (see below)
    Architect TBD
    Contractor TBD
    Estimated project cost $607,000  
    Estimated completion date Summer 2021
    Funding source 2016 Capital levy  
     
    Description: This project is anticipated to provide painting of selected interior and exterior surfaces at seven school locations over two summers (in 2020 and 2021), including the following:
    · Cascade High School: Prep and paint all interior spaces in the Gym building, prep and paint all exterior painted surfaces (all buildings), clean, caulk and seal all exterior masonry (all buildings).
    · Cedar Wood Elementary School: Interior painting at the Administration Building, including the library and computer lab, interior painting in the Cafeteria/Kitchen
    · Mill Creek Elementary School: Interior painting of the entire facility.
    · Evergreen Middle School: Interior painting in lobbies and corridors.
    · Madison Elementary School: Paint covered play structure.
    · Emerson Elementary School: Paint covered play structure.
    · Jackson Elementary School: Paint covered play structure.
     
    Project update as of December 8, 2016: This project is scheduled for the summers of 2020 and 2021.
     
    (TBD = to be determined)
                 
    _________________________________________________________________________________
     
    Additional Project Information
     
    Estimated construction cost
     
    $385,311
    Construction contract
       
    TBD
    Change orders during construction  TBD  
    Final construction cost
     
    TBD
    Final project cost
       
    TBD  
    Actual completion date
     
    TBD
                
    Completion schedule:
    Architect selection Fall 2019  
    Educational specifications N/A
    Design phase Fall 2019
    Drawings and specifications
    Winter 2020
    Permit applications Winter 2020
    Out to bid Spring 2020
    Bid award Spring 2020
    Construction start Summer 2020  
    Occupancy/move in Summer 2021
     



    (P483) Flooring Replacements at 6 Sites

      
    Location Varies (see below)
    Architect TBD  
    Contractor TBD
    Estimated project cost $2,526,000
    Estimated completion date Fall 2022
    Funding source
       
    2016 Capital levy
     
    Description: This project is anticipated to include full flooring replacement, demolition, prep, new carpet, hard surface flooring, and wall base at the following facilities. Wood flooring in Gymnasiums is excluded.
    · Cedar Wood ES
    · Mill Creek ES
    · Hawthorne ES
    · Penny Creek ES
    · Jackson HS Science classrooms
    · Cascade HS Science classrooms
    The work in 2017 will include replacement of flooring in Hawthorne Elementary.
     
    Project update as of December 8, 2016: Selection of Architect will be made in December 2016. The work is scheduled for the summer of 2017.
     
    (TBD = to be determined)
    _______________________________________________________________________________________
     
    Additional Project Information
     
    Estimated construction cost
     
    TBD
    Construction contract
       
    TBD
    Change orders during construction  TBD  
    Final construction cost
     
    TBD
    Final project cost
       
    $534,000 for Hawthorne 2017  
    Actual completion date
     
    TBD
                
    Completion schedule:
    Architect selection January 2017
    Educational specifications N/A
    Design phase February 2017
    Drawings and specifications
    March 2017
    Permit applications April 2017
    Out to bid May 2017
    Bid award May 2017
    Construction start June 2017
    Occupancy/move in August 2017
     



    (P554) Gateway MS Roof Replacement

     

    Location 15404 Silver Firs Drive, Everett, WA 98208
    Architect Rolluda Architects  
    Contractor TBD
    Estimated project cost $2,000,000
    Estimated completion date Fall 2017
    Funding source
       
    2016 Capital bond
     
     
    Description: The roofing project includes removal of the existing roofing on all buildings; and installation of new composition shingles, flashing, sheet metal and gutters on sloped-roof buildings; and installation of new PVC membrane roofing, flashing, sheet metal and gutters on flat-roofed buildings.
    Project update as of December 7th, 2016: The architect started design work in September. Site investigations and interviews have been completed to inform the design. Schematic design is underway with projected timing of completing the roofing over the Summer of 2017.
     
    (TBD = to be determined)
    _______________________________________________________________________________________
     
    Additional Project Information
     
    Estimated construction cost
     
    $1,268,000
    Construction contract
       
    TBD
    Change orders during construction  TBD  
    Final construction cost
     
    TBD
    Final project cost
       
    TBD  
    Actual completion date
     
    TBD
                
    Completion schedule:
    Architect selection August 2016
    Educational specifications N/A
    Design phase December 2016
    Drawings and specifications
    February 2017
    Permit applications February 2017
    Out to bid March 2017  
    Bid award April 2017
    Construction start June 2017  
    Occupancy/move in
       
    August 2017
     



    (P582) Athletics Roof & Gutter Replacement (plus South Ticket Booth/Football Press Box)

     

    Location 3721 Oakes Ave., Everett, WA 98201
    Architect Ato Apiafi Architects      
    Contractor Progressive Roofing / Wayne’s Roofing
    Estimated project cost $350,000
    Estimated completion date October 2016
    Funding source
       
    2010 Capital levy
     
    Description: Remove existing roofing material; install new asphalt shingle roofing, sheet metal, gutters and downspouts on the athletics building, football press box and the south ticket booth.
     
    Project update as of December 06, 2016: Project is substantially complete. All punch list items are complete except the stucco top coat and painting which is weather dependent (requires 45-degree weather or warmer).
     
    (TBD = to be determined)
    _______________________________________________________________________________________
     
    Additional Project Information
     
    Estimated construction cost
     
    $245,000
    Construction contract
       
    $190,000
    Change orders during construction  $6,762  
    Final construction cost
     
    TBD  
    Final project cost
       
    TBD    
    Actual completion date
     
    TBD  
                
    Completion schedule:
    Architect selection February 2016
    Design phase March 2016
    Drawings and specifications
    April 2016
    Permit applications April 2016
    Out to bid May 2016
    Bid award June 2016
    Construction start July 2016  
    Occupancy/move in
       
    December 1
     
     
     
     
     
     
     
     



    (P582) Re-roof 4 Portables

     

    Location TBD
    Architect TBD  
    Contractor TBD
    Estimated project cost $40,000
    Estimated completion date August 2017
    Funding source 2010 Capital levy      
     
    Description: Replace roofing on four portables in the district based on age and poor condition.
     
    Project update as of December 8, 2016: In January of 2016, a determination will be made as to which portables will be re-roofed.
     
    (TBD = to be determined)
    _______________________________________________________________________________________
     
    Additional Project Information
     
    Estimated construction cost
     
    $35,000  
    Construction contract
       
    TBD  
    Change orders during construction  TBD    
    Final construction cost
     
    TBD  
    Final project cost
       
    TBD    
    Actual completion date
     
    TBD  
                
    Completion schedule:
    Architect selection December 2016
    Educational specifications N/A
    Design phase February 2017
    Drawings and specifications
    March 2017
    Permit applications March 2017
    Out to bid April 2017
    Bid award May 2017
    Construction start June 2017  
    Occupancy/move in August 2017
     



    (P583) Roofing Replacement at 6 Sites

     

    Location Varies (see below)
    Architect TBD  
    Contractor TBD
    Estimated project cost $5,275,000
    Estimated completion date Fall 2022
    Funding source 2016 Capital levy        
     
    Description: This project includes removing and replacing roofing at six school locations during summers between 2018 and 2022, including work at the following schools
    · Jackson ES: Includes tear-off, R-30 rigid insulation, PVC membrane over ¼” underlayment, flashing, sheet metal, and gutters. Excludes library and covered play, which were replaced in 2010.
    · Lowell ES: Includes tear-off, composition shingles, flashing, sheet metal, and gutters. Excludes Covered Play.
    · Cascade HS Science Building: Includes tear-off, R-30 rigid insulation, PVC membrane over ¼” underlayment, flashing, sheet metal, and gutters.
    · Mill Creek ES: Includes tear-off, composition shingles, flashing, sheet metal, and gutters. Excludes Covered Play.
    · Silver Firs ES: Includes tear-off, composition shingles, flashing, sheet metal, and gutters. Excludes Covered Play.
    · Everett HS: Main Building: Includes tear-off, composition shingles, flashing, sheet metal, and gutters.
     
     
    Project update as of December 7, 2016: This project will be accomplished in phases during summers between 2018 and 2022. Note that Gateway MS reroofing is a separate project, P554.
     
    (TBD = to be determined)
    _______________________________________________________________________________________
     
    Additional Project Information
     
    Estimated construction cost
    $3,278,240
    Construction contract
     
    TBD
    Change orders
    during construction
    TBD
    Final construction cost
    TBD  
    Final project cost
     
    TBD  
    Actual completion date
    TBD  
                
    Completion schedule:
    Architect selection Fall 2017
    Educational specifications N/A
    Design phase Fall 2017
    Drawings and specifications
    Winter 2018
    Permit applications Spring 2018
    Out to bid Spring 2018
    Bid award Spring 2018
    Construction start Summer 2018  
    Occupancy/move in
       
    Fall 2022



    (P685) HVAC Upgrades at 8 Sites

     

    Location Varies (see below)
    Architect Rolluda (Gateway MS only)  
    Contractor TBD
    Estimated project cost $9,900,000  
    Estimated completion date Summer 2023
    Funding source 2016 Capital bond    
     
    Description: The scope of work includes replacement of mechanical units and control systems, cooling tower replacement and boiler replacement at the following schools. Ductwork replacement is not included.
    · Gateway MS (unit and control system replacement)
    · Athletics (unit and control system replacement)
    · Everett HS Main Building (unit and control system replacement)
    · Cascade HS Science Building (control system replacement)
    · Madison ES Administration/Library (unit and control system replacement)
    · Gateway MS (cooling tower replacement)
    · Sequoia HS (cooling tower replacement)
    · Whittier ES (Boiler replacement)
    · Everett HS Vocational Building (Boiler replacement)
    · Silver Lake ES Building ‘B’ (Boiler replacement)
    · Madison ES (Boiler replacement)
    · Cascade HS (Boiler replacement).
    Project update as of December 7th, 2016: The heating, ventilation and air conditioning systems (HVAC) will be replaced at Gateway MS during the summer of 2017. The architect began design work for this project in October and preliminary data gathering has been completed with schematic design underway. The other HVAC projects will be phased through the Summer of 2023.
     
    (TBD = to be determined)
                 
    _____________________________________________________________________________________
     
    Additional Project Information
     
    Estimated construction cost
     
    $6,234,000
    Construction contract
       
    TBD
    Change orders during construction  TBD  
    Final construction cost
     
    TBD
    Final project cost
       
    TBD  
    Actual completion date
     
    TBD
                
    Completion schedule:
       
    (Dates below are for Gateway only, others to follow later)
    Architect selection August 2016
    Educational specifications N/A
    Design phase December 2016
    Drawings and specifications
    February 2017
    Permit applications February 2017
    Out to bid March 2017  
    Bid award April 2017
    Construction start June 2017  
    Occupancy/move in
       
    August 2017
     



    (P775) Technology Infrastructures

      
    Location Varies
    Architect Hargis Engineering  
    Contractor TBD
    Estimated project cost $2,300,000  
    Estimated completion date TBD
    Funding source 2016 Capital bond      
     
    Description: Work includes upgrades to the district’s wireless infrastructure to support increased wireless connectivity, upgrades to the cooling systems in the rooms that house data equipment, and installation of electrical circuits that are powered by the backup generators.
     
    Project update as of December 6, 2016: Hargis Engineering, the selected engineering firm, has completed their surveying of technology rooms throughout the district. They are developing a draft report and cost estimate. This is a multi-year project and the four high schools will be the first to be upgraded in the summer of 2017.
     
    (TBD = to be determined)
    _______________________________________________________________________________________
     
    Additional Project Information
     
    Estimated construction cost
     
    TBD
    Construction contract
       
    TBD
    Change orders during construction  TBD    
    Final construction cost
     
    TBD  
    Final project cost
       
    TBD    
    Actual completion date
     
    TBD  
                
    Completion schedule:
    Architect selection August 2016
    Educational specifications TBD
    Design phase May 2017
    Drawings and specifications
    May 2017
    Permit applications TBD
    Out to bid May 2017
    Bid award June 2017
    Construction start June 2017
    Occupancy/move in August 2017
     



    (P822) Fire Alarm System Upgrades at 7 Sites

      
    Location Varies (see below)
    Architect TBD  
    Contractor TBD
    Estimated project cost $530,000
    Estimated completion date 2020
    Funding source 2016 Capital levy    
     
    Description: Replacement of aging fire alarm controls. In some cases, the devices are serviceable and only the control panel needs replacement. At one location, the devices and control panel need to be replaced resulting in a full system upgrade. Following is the list of sites and scope for each:
    Jackson ES: Panel Replacement
    Madison ES: Panel Replacement
    Lowell ES: Panel Replacement
    Everett HS Vocational, Commercial, and Auditorium Buildings: Panel Replacement
    Penny Creek ES: Panel Replacement
    Heatherwood MS: Panel Replacement
    Athletics: Full System
     
    Project update as of December 7th, 2016: The fire alarm panel replacement at Heatherwood MS is planned for the summer of 2017 and design work will start in January. The other locations will be phased in over the life of the bond.
     
    (TBD = to be determined)
    _______________________________________________________________________________________
     
    Additional Project Information
     
    Estimated construction cost
    $265,000
    Construction contract
     
    TBD
    Change orders
    during construction
    TBD
    Final construction cost
    TBD
    Final project cost
     
    TBD  
    Actual completion date
    TBD
                
    Completion schedule:
    Architect selection TBD
    Educational specifications N/A
    Design phase TBD
    Drawings and specifications
    TBD
    Permit applications TBD
    Out to bid TBD
    Bid award TBD
    Construction start TBD
    Occupancy/move in TBD



    (P960) Support Services Master Plan

     

    Location Varies
    Architect Botesch, Nash & Hall  Architects  
    Contractor N/A
    Estimated project cost Approx. $7 million for all projects incl. property acquisition
    Estimated completion date December 2016
    Funding source Varies
     
    Description: Possible future “domino” series of events/moves responding to the need for a larger Science Resource Center (SRC), conversion of SRC space at Hawthorne ES to classrooms/early learning center, and a technology deployment center.
     
    Possible sequence of events
    1. Upgrade old bus facility building to a technology deployment center.
    2. Secure facility for more busses in south end (south end bus satellite facility or school site)
    3. Relocate some busses from Central Bus Facility to south/north end to make room for EPS transportation department
    4. Construct tenant improvements at west side of Central Bus Facility, and move transportation department to this space from the athletics building
    5. Relocate athletics department to CRC
    6. Purchase nearby building for use as SRC/instructional materials center
    7. Construct tenant improvements to athletics building, and move in tenant from nearby building
    8. Construct tenant improvements to nearby building, and move in SRC and instructional materials
    9. Construct tenant improvements at Hawthorne ES (for classrooms or early learning center)
     
    Project update as of December 7, 2016: The architect provided a rough draft of the various potential aspects or implications of this project, including building conditions, space needs, timing/sequencing, and possible solutions. The architect will follow up with layouts, floor plans, and cost estimates. The final report is due by December 15, 2016.
     
    (TBD = to be determined)
    _______________________________________________________________________________________
     
    Additional Project Information
     
    Estimated construction cost
     
    TBD
    Construction contract
       
    TBD
    Change orders during construction  TBD    
    Final construction cost
     
    TBD  
    Final project cost
       
    TBD    
    Actual completion date
     
    TBD  
                
    Completion schedule:
    Architect selection August 2016
    Educational specifications N/A
    Design phase December 2016
    Drawings and specifications
    N/A
    Permit applications N/A
    Out to bid N/A
    Bid award N/A
    Construction start N/A  
    Occupancy/move in
       
    N/A
     



    (P994) 174th Street SE Site Purchase

     

    Location 4328 & 4400 174th St. SE, Bothell, WA 98012
    Varies
    Real Estate Consultant TBD    
    Consultants – Land Use Brent Planning Solutions
    Estimated project cost $1,220,000 – Existing offer
    $3,750,000
    Estimated completion date May, 2017
    Funding source Rent, miscellaneous  
     
    Description: Purchase property adjacent to the 180th St. SE Site to accommodate a roadway to the north (access to 174th St SE) and athletic fields for a future high school
     
    Project update as of December 8, 2016: The owners of 4328 & 4400 174th St. SE, Bothell, WA 98012 have accepted the district’s $1,220,000 offer for their property. The district conducted a feasibility study of the two properties. A survey of the properties is complete. At the November 22, 2016 board meeting, the board approved resolution #1140 approving the purchase. Closing date is set for December 12. At the January 10 board meeting the board will be asked to declare the structures located on this site as surplus. The residential structures and out buildings will be demolished to make way for a new drive for Elementary #18.
     
                
    (TBD = to be determined)
    _______________________________________________________________________________________
     
    Additional Project Information
     
    Estimated construction cost
     
    N/A
    Construction contract
       
    N/A
    Change orders during construction  N/A    
    Final construction cost
     
    N/A  
    Final project cost
           
    Actual completion date
     
    May, 2017  
                
    Completion schedule:
    Architect selection N/A
    Educational specifications N/A
    Design phase N/A
    Drawings and specifications
    N/A
    Permit applications N/A
    Out to bid N/A
    Bid award N/A
    Construction start N/A  
    Closing May, 2017  
     
     



    (P995) Purchase Future ES Property

     

    Location Southeast portion of the district
    Real Estate Broker New Ventures  
    Consultants – Land Use Brent Planning Solutions
    Consultants – Architect Hutteball & Oremus
    Estimated project cost $4,500,000  
    Estimated completion date January 2017
    Funding source 2016 Capital bond      
     
    Description: Locate and purchase property suitable for a future elementary school.
     
    Project update as of December 8, 2016: The district has contracted with a broker who is locating possible properties for a future elementary school. An update meeting with the broker was held on November 22, 2016. The district has narrowed the property search to one location. Brent Planning Solutions and Hutteball & Oremus will be working on a limited “fit” study for the site.
                
    (TBD = to be determined)
    _______________________________________________________________________________________
     
    Additional Project Information
     
    Estimated construction cost N/A  
    Construction contract N/A      
    Change orders during construction
    N/A
    Final construction cost N/A      
    Final project cost TBD          
    Actual completion date TBD  
                
    Completion schedule:
    Architect selection N/A
    Educational specifications N/A
    Design phase N/A
    Drawings and specifications
    N/A
    Permit applications N/A
    Out to bid N/A
    Bid award N/A
    Construction start N/A
    Occupancy/move in N/A
     

    Back to top




    1