View Properties

Resolution 469
Implement SEPA mitigation to construct Middle School #5

 

Handle: Document-34125
Owner: Diaz, Ailienette (User-392, 08810:EVERETT)DS
Tuesday, April 19, 2011 04:01:54 PM PDT
Wednesday, August 3, 2011 02:42:56 PM PDT
Modified By:
Locked By:
  • EVERETT SCHOOL DISTRICT NO.
  • 2
RESOLUTION NO.
  • 469
A Resolution of the Board of Directors (the"Board") of the Everett School District No.
  • such impacts include:
(1) with respect to earth, the Proposed Action willchange the topography of the site, will require theremoval of some organic soils and the import ofapproximately 37,700 cubic yards of fill material,and construction activities could lead to soil
  • 1-
erosion and sedimentation without appropriateerosion controls.
  • EIS at 52-62.
  • (6) with respect to noise, the Proposed Action will
result in noise from site generated activities,traffic and construction activities. A list of such recommendedconditions, as understoo...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf
Res - 469.pdf
No
4
431172
No
Appears In: 1990-1999 1992
Preferred Version: Resolution 469