View Properties

Rev 2006 bond detail.doc
Handle: Document-41657
Owner: Anderson, Anthony (User-5032, 13765:EVERETT)DS
Friday, October 12, 2012 01:31:53 PM PDT
Wednesday, September 29, 2021 06:12:22 PM PDT
Modified By: Kummerle, Christina (User-398, 08833:EVERETT)DS
Locked By:
  • 2006 Bond/Levy Detail by School DRAFT 11/16/05
School/FacilityProposed 2006 Bond MeasureComments on proposed 2006 bond projects2002 Bond ProjectsCascade High Replace roof at auto shop,Upgrade (replace) grease trap at kitchenEverett High Modernization of gymnasium building,Seismic upgrades to cafeteria building, commercial building and little theater,Upgrade HVAC system at little theater,Add standby (emergency) electrical generators at 5 buildings,Upgrade (replace) grease trap at kitchenThe Everett HS Gymnasium was built in 1969, and the work proposed will include modernization and/or replacement of major building systems including heating, ventilation, electrical...
Allowed
Microsoft Office Word (.doc, .dot) - application/msword
Rev 2006 bond detail.doc
No
4
58880
No
Appears In: WBL 2005-06
Preferred Version: Rev 2006 bond detail.doc