View Properties

Rev 2006 bond detail.doc
Handle: Version-56565
Owner: Anderson, Anthony (User-5032, 13765:EVERETT)DS
Friday, October 12, 2012 01:31:53 PM PDT
Wednesday, September 29, 2021 06:12:22 PM PDT
Modified By: Kummerle, Christina (User-398, 08833:EVERETT)DS
- 2006 Bond/Levy Detail by School DRAFT 11/16/05 School/Facility Proposed 2006 Bond Measure Comments on proposed 2006 bond projects 2002 Bond Projects Cascade High Replace roof at auto shop, Upgrade (replace) grease trap at kitchen Everett High Modernization of gymnasium building, Seismic upgrades to cafeteria building, commercial building and little theater, Upgrade HVAC system at little theater, Add standby (emergency) electrical generators at 5 buildings, Upgrade (replace) grease trap at kitchen The Everett HS Gymnasium was built in 1969, and the work proposed will include modernization and/or replacement of major building systems including heating, ventilation, electrical...
1
Appears In: Rev 2006 bond detail.doc