- EVERETT SCHOOL DISTRICT NO.
- 2
RESOLUTION NO.
- 469
A Resolution of the Board of Directors (the
"Board") of the Everett School District No.
- such impacts include:
(1) with respect to earth, the Proposed Action will
change the topography of the site, will require the
removal of some organic soils and the import of
approximately 37,700 cubic yards of fill material,
and construction activities could lead to soil
-1-
erosion and sedimentation without appropriate
erosion controls.
- EIS at 52-62.
- (6) with respect to noise, the Proposed Action will
result in noise from site generated activities,
traffic and construction activities. A list of such recommended
conditions, as understoo...